Search
Close this search box.
Biust Logo
        • Undergraduates

Botswana International University Of Science And Technology (BIUST) Solar Power Plant (Feasibility Study)

Botswana International University Of Science And Technology (BIUST) Solar Power Plant (Feasibility Study)

[featured_image]
Download was expired on 30 Jun 2022 12:00 AM
  • Version
  • Download 376
  • File Size 4.74 MB
  • File Count 1
  • Create Date 24 May 2022
  • Last Updated 24 May 2022

Botswana International University Of Science And Technology (BIUST) Solar Power Plant (Feasibility Study)

The aim of the call is invite consultants to develop a bankable feasibility study for BIUST solar power plant.

Attached Files

FileAction
Expression of Interest Ad (1).pdfDownload

Leave a Reply

Your email address will not be published. Required fields are marked *